High Capacity Roads

Project info
Informative Study of the works Extension of the A-57 in the section Pilarteiros Barro and connection to the AP-9 in Curro
Informative Study of the works Extension of the A-57 in the section Pilarteiros Barro and connection to the AP-9 in Curro
CLIENT: Spanish Ministry of Public Works

LOCATION: Pontevedra
DATE: 2009-12-01
AMOUNT: 381.335,00 €
DESCRIPTION

The Informative Study is analisys of the technical, economic and environmental best alternative for closing the north-south corridor from Pontevedra Vigo (A-59) and O Porrino (A-57) which encircles the coastal towns of Pontevedra and connects to north of the capital with the N-550 and / or AP-9, thus achieving more functionality of the whole. All previous highways, are in writing project. The section begins with the connection Pilarteiros and ends at the town of Curro. The length of the section is about 12 miles. In its route has three links, saving through rivers Verducido viaduct, Pons and Gandara. Likewise studied tunnel lengths ranging depending on the choice between 300 and 2,000 meters.