Preliminary Design

Project info
Preliminary Engineering Design. Environmental Impact Study and Landscape Integration Study in the road CV-15. Stretch La Pelechaneta (Vall d’Alba) CV-165 Castellón.
Preliminary Engineering Design. Environmental Impact Study and Landscape Integration Study in the road CV-15. Stretch La Pelechaneta (Vall d’Alba) CV-165 Castellón.
CLIENT: Valencia Regional Government

LOCATION: Castellón
DATE: 2008-05-01
AMOUNT: 380.801,66 €
DESCRIPTION

Basic Project for a 21 Km stretch. A long part of the existing road are cross-town links for several towns (Vall D´Alba, Sierra de Engarcerán, Albocasser y Cati) and has at-grade junctions. In order to improve road safety and line time, the new road will have a double-lane road section with wide verges (7/10) and connections with local roads are designed by junctions. There are 5 diamond interchanges, 4 of them dumbbell interchanges and 1 has a single roundabout. The current road will be use as an agricultural track and as bicycle lane. It will be integrated in the Generalitat Valenciana network. This road crosses once the Camino de Santiago.