Urban Integration

Project info
Specific Installations and works of M-30 Tunnels Control Center: Inspection, Supervision and Quality Control
Specific Installations and works of M-30 Tunnels Control Center: Inspection, Supervision and Quality Control
CLIENT: Madrid Calle 30, S.A.

LOCATION: Madrid
DATE: 2006-04-01
AMOUNT: 2.321.296,00 €
DESCRIPTION

The intervention on the first loop road of Madrid consists of the burial of near 48 km of its route. Concretely, it has involved: - the remodeling of the junctions with existing roads new access to the M-607, remodeling connections with Palomera, Costa Rica, Avenida Of America, the O´Donnell/ R3 axis, Avenida. del Mediterráneo. - Burial of the of the southern arc and the Sections of Avenida of Portugal and connections with the A3. - Direct connection with Embajadores Street with the M-40 highway. - Creation of the South Bypass, to divert part from the traffic that saturates the Southern Junction. Through this bypass, the traffic that doesn't pass through the northern junction is funneled cutting the time to get from east to west, and vice versa.